- Anna Shmukler , PE - Project Principal
- Lewis Brown, LS - Project Surveyor
- Dan Bodycomb, PE - Project Engineer
- Lisa Herrera, EIT - Project Engineer
Transportation Systems Design, Inc. personnel were responsible
for performing the design, engineering, hydraulic study and surveying
for this project. Specifically we improved the grades, designed
a 4-barrel 10' x 10' box culvert to GDOT standards, performed
the GPS control, courthouse research, property owner notification,
database survey, performed the FEMA study to achieve a "no-rise" situation
and coordinated with the FEMA contact on behalf of Fulton County.
TSD had to accommodate the entrance to a new subdivision adjacent
to the project, which came on-line after we commenced the project.
Deliverables included Conceptual, Preliminary, Right-of-Way
and Final Construction Plans.