Creel Road Improvements, Fulton County
  • Anna Shmukler, PE - Project Principal
  • Lewis Brown, LS - Project Surveyor
  • Margie Pozin, PE - Road Design
  • Lisa Herrera, EIT - Drainage Design
  • Ann Southerland, RLA - Landscape Architect

Transportation Systems Design, Inc.'s personnel were responsible for performing the design, engineering, drainage design and surveying for this 2- mile long project. The Right-of-Way plans TSD prepared became the prototype for the County's PR program . The project consisted of designing a 2 lane paved roadway to replace an existing dirt road. Fulton County required compliance with AASHTO design standards. In order to achieve this we had to realign some of the horizontal curves and most of the vertical grades. These improvements were designed with consideration for the existing right of ways and properties. We also performed the drainage design, coordinated with the County's Development Services Office during the permitting process, worked with the County's Arborist to save significant trees, created the displays for and participated in the Public Hearing, performed the GPS control, courthouse research, property owner notification, database survey, Right-of-Way staking and participated in all of the Field Plan Reviews.

Deliverables included Conceptual, Preliminary, Right-of-Way and Final Construction Plans.

 

copyright (c) 2005 TSD Engineers, Inc.
site design by thesepixels.com