Business Parkway Extension, Fulton County
  • Anna Shmukler, PE - Project Principal
  • Kent Mullinax - Project Surveyor Manager
  • Dan Bodycomb, PE - Road Design Construction
  • Lisa Herrera, EIT - Drainage Design

Transportation Systems Design, Inc.'s responsibilities on this project included: performing the design; engineering; drainage; surveying; and coordination with Cobb County , and with consulting engineers on adjacent projects. Three different design projects merged together and formed this project. In addition, four different firms surveyed the area before TSD began working on the project. TSD coordinated between the four different design firms and connected the 4 databases into one continuous mapping. This project was performed in two units. In the first unit, TSD designed one mile of roadway at a new location to GDOT standards, designed the widening of Frey Road, performed all drainage studies, coordinated with all appropriate utilities on the design, performed the GPS control, courthouse research, database survey, and Right-of-Way staking. TSD performed project management services supervising the design team, which included environmental, traffic, geotechnical and structural subconsultants. In addition TSD prepared the Conceptual, Preliminary, Right-of-Way and Final Construction Plans.

 

The major features of the second unit was comprised of the widening of 1 mile of Shiloh Road and the design of a parallel bridge over I-75. For this unit our responsibilities included: the Conceptual, Preliminary and Right-of-Way plans, land surveying, project management of our structural, geotechnical and traffic subconsultants and coordination with the County DOT staff and utilities.

 

Deliverables included CAiCE and MicroStation electronic files, conforming to GDOT standards and reproducibles of design drawings.

copyright (c) 2005 TSD Engineers, Inc.
site design by thesepixels.com