Transportation Systems Design, Inc. personnel were responsible for performing several tasks on this project. We assisted in the formulation of the Work Plan, performed Field Verification, Data Collection, GPS and Primary Control, Digital Surveying covering Cross-Sections and Inventory Verification, Monument Recovery and Taking Digital Photographs. TSD obtained well over 330 Cross-sections, including almost 50 for the 500-year flood. Our accuracy was 0.5' Horizontal and 0.1' Vertical. GPS control was performed for the 114 square miles included in this study. TSD personnel were responsible for obtaining cross-sections in one-third of the basin, which is roughly bounded on the south by the Chattahoochee River , Crabapple to the north, Ocee to the East and Sweat Mountain to the west.
Deliverables included: Electronic Files, Bond Drawings and Digital Photographs.