- Anna Shmukler, PE - Project Principal
- Troy Shepherd, EIT - Road Design
- Lisa Herrera, EIT - Drainage Design
Transportation Systems Design, Inc.'s responsibilities for
this project included: performing the design; engineering; and
coordination with the Georgia DOT Urban Design Office, another
consultant preparing an adjacent project, and all appropriate
utility companies for this project. The project consisted of
connecting existing streets into one continuous roadway. This
included the design of portions of the roadway at new locations
as well as the widening of existing streets. The vertical and
horizontal alignments were designed to GDOT and AASHTO standards.
The roadway was designed to fit between existing buildings with
a minimum impact on the existing property owners. TSD took over
this project from the city, which provided the survey data. We
worked on a "Fast-Track" basis to complete the Right-of-Way
and Final Construction Plans in order to keep the city from losing
state funding for the project. We also coordinated with all appropriate
utilities on our design, attended Field Plan Reviews and worked
very closely with GDOT on the city's behalf to shepherd this
project through the approval process.
Deliverables included CEAL and MicroStation electronic files
as well as reproducibles of the design drawings.